Client and Property
Basic project details used in the proposal header and scope summary.
Building Profile
Required scope questions that affect access, production pace, and quote risk.
Jobsite Conditions
Access, utilities, and occupancy constraints for the operating plan.
Included Scope
Checked items appear as included work. Protected exclusions stay clean in the proposal.
Notes and Assumptions
These flow into the proposal exactly as operating assumptions.
Production Math
Whiteboard model: 40,000 vertical sq ft ÷ 4,000 sq ft/hr = 10 hours; 10 × $325/hr = $3,250 base; ×2-3 = $6,500-$9,750.
Special Costs
Permits, travel, escorts, chemicals, water hauling, after-hours cost, or other support items. Use the traditional/trade cost field above for hybrid access support.